Planning Scheme Amendment – Package B – Commercial

Share Planning Scheme Amendment – Package B – Commercial on Facebook Share Planning Scheme Amendment – Package B – Commercial on Twitter Share Planning Scheme Amendment – Package B – Commercial on Linkedin Email Planning Scheme Amendment – Package B – Commercial link

Consultation has concluded.

The proposed changes to the planning scheme for ‘Package B’ include:

  • Change to the zoning of 78 East Street, Mount Morgan (Lot 1 RP602282, Lot 1 RP605080 and Lot 2 RP608362) from Low Density Residential to Local Centre Zone, to reflect the outcome of a Council meeting resolution on 16 August 2022;
  • Changes to the allow a Shopping Centre and Shops within the Specialised Centre Zone (Yaamba Road Precinct), in particular at 452-488 Yaamba Road, Norman Gardens (formally known as Lot 25 on RP610513). This change aligns with Development Approval D/77-2022 - Material Change of Use for a Shopping Centre, Showroom and Multiple Dwellings; and
  • Administrative updates to align with the Planning Act, including updates to Schedule 4, which notes development approvals that are inconsistent with the planning scheme and Schedule 5, which notes infrastructure designations within the planning scheme. 


Consultation has concluded.

The proposed changes to the planning scheme for ‘Package B’ include:

  • Change to the zoning of 78 East Street, Mount Morgan (Lot 1 RP602282, Lot 1 RP605080 and Lot 2 RP608362) from Low Density Residential to Local Centre Zone, to reflect the outcome of a Council meeting resolution on 16 August 2022;
  • Changes to the allow a Shopping Centre and Shops within the Specialised Centre Zone (Yaamba Road Precinct), in particular at 452-488 Yaamba Road, Norman Gardens (formally known as Lot 25 on RP610513). This change aligns with Development Approval D/77-2022 - Material Change of Use for a Shopping Centre, Showroom and Multiple Dwellings; and
  • Administrative updates to align with the Planning Act, including updates to Schedule 4, which notes development approvals that are inconsistent with the planning scheme and Schedule 5, which notes infrastructure designations within the planning scheme. 


  • CLOSED: This survey has concluded.
    Consultation has concluded
    Share Make a Submission on Facebook Share Make a Submission on Twitter Share Make a Submission on Linkedin Email Make a Submission link